Skip to content
Hail and wind season runs April through September.
Monday – Friday: 7 a.m. – 5 p.m.Contractor registration · IA Reg. no. 000000Lead-Safe Certified Firm (RRP) · IA Firm cert. no. 000000VerifyGeneral liability insurance
2 more licenses
  • Contractor registration · IA Reg. no. 000000
  • Lead-Safe Certified Firm (RRP) · IA Firm cert. no. 000000Verify
  • General liability insurance

Services

Windows and doors

Hail breaks glass and cracks vinyl frames. A limb can take a whole window and the wall around it.

We board up what is open the day you call, then measure for replacements. Windows are ordered after you sign, and the lead time is told to you up front.

What's included

  • Board-up of open windows and doors

  • Replacement windows, entry doors and patio doors

  • Trim, flashing and sealing around each opening

  • Bedroom windows sized to egress rules

  • Haul-away of the old units

An empty room with grey walls, wide black-framed windows and a door to a white deck

Not included

What this work doesn't cover

  • Blinds and window coverings

    Reset them yourself or ask us to.

  • Storm doors

    They're a separate line unless the insurer lists them.

  • Garage doors

    See Garages and fences.

Cost

What changes the cost

  • The number of openings

    Each window is measured and priced on its own line.

  • Size and type

    Egress windows in bedrooms need a minimum opening.

  • Lead time

    Windows are made to order; the wait depends on the maker.

  • Wall damage around it

    A frame torn out may take siding and sheathing with it.

  • Interior trim

    Finished trim is replaced or repaired to your choice.

How it goes

The work, in order

  1. 01
    Us

    Step 1: Board-up

    We secure open windows and doors the day you call, as the crew's day allows.

  2. 02
    Us

    Step 2: Measure and order

    We measure each opening and give you the lead time before you sign.

  3. 03
    Us

    Step 3: Install

    Old unit out, flashing and sealant checked, new unit in.

  4. 04
    You

    Step 4: The last check

    We open and close each one with you.

Questions about this work

Is my house built before 1978?

Windows in older houses may have lead paint on frames and sills. EPA's rule applies to window replacement in those homes. Tell us the year when you call, and see Registration and insurance for what we hold.

How long do new windows take?

The maker sets it. We'll tell you the lead time before you sign, and we keep the opening protected until the window arrives.

Start with the window

Tell us what's broken. We'll board it up and measure.